Gate Holding Due to Departure Delays
(a) Pilots should contact ground control or clearance delivery prior to starting engines as gate hold procedures will be in effect whenever departure delays exceed or are anticipated to exceed 15 minutes. The sequence for departure will be maintained in accordance with initial call up unless modified by flow control restrictions. Pilots should monitor the ground control or clearance delivery frequency for engine startup advisories or new proposed start time if the delay changes.
(b) The tower controller will consider that pilots of turbine-powered aircraft are ready for takeoff when they reach the runway or warm-up block unless advised otherwise.
Ask it like you'd ask your CFI. Every FAR a student pilot needs, the full AIM, and NTSB Part 830 — verbatim, with links to the official source.
Open the FAR/AIM search →